Javelin Quarry
The Javelin Mine, originally utilized for sand and gravel mining as early as the 1960s during the construction of i84, changed hands several times before being acquired by Nick Fitzpatrick in December 2018. Under Fitzpatrick’s stewardship, the focus shifted from alluvial sand or gravel to hard rock mining and crushing, aiming to produce high-quality aggregate materials for the local commercial construction industry. By 2019, the site featured a certified truck scale, and advancements continued with the installation of an electric-powered modular crushing spread capable of processing 4500 tons per day by 2022. In 2023, the quarry reached a new peak in productivity, processing a record amount of material and serving a wide customer base across the region.
-
December 2018
Mining Started
-
Rock, Argillite / Greywacke
Primary Bedrock
-
3 Million
Tons Mined
Featured products
See all-
ITEM 4 (NYS Spec Type 2)
Start quote -
57 Stone
Start quote
We offer delivery across the Hudson Valley.
-
3 to 10 tons
Single Axle Dumptruck
-
10 to 20 tons
Tandem Dumptruck
-
20 to 26 tons
Triaxle Dumptruck
-
30 to 40 tons
Trailer